As being subcontractor at Saudi Arabia 'Jeddah Highway Tunnel
Constructions' work in year 2005
Photos of King of Khalid Road Tunnel
Mecca/Saudi Arabia
Document of Work Experience (KASMET Cons.) |
|
Totally
163.530 m3
tunnel excavation ,
37.332 m3
tunnel concrete,
136,00 m2
cross-section aread, Ø16,72 m diametered highway tunnel,
2 x 600 = 1.200 m.
sized tunnel and road construction were made. |
|