4. |
Construction
Techniques Used |
: |
Dam Body (Clay based sand - gravel filling),
Dam access roads (excavation, filling, stabilization,
compaction and transportation), Spillway type (intake from
opposite side, free, reinforced concrete made by steel
formwork), Derivation - bottom outlet tunnel (Diameter 3m.,
with circular cross section, 478,50 m. long), Permanent
equipment (reinforced concrete water intake structure with
bell-like entrance, emergency and adjustment valve rooms,
valves and pressure pipes with accessories), Miscellaneous
works (reinforced concrete limnigraphy structure and
settling reservoirs). |