Dicle Dam and HEPP Installation Construction . . .

 
Photos of Dicle Dam and HEPP Installation Construction Work Experience Certificate (M.BAYINDIR)

Work Experience Certificate (M. YILMAZ)

Specifications of Dicle Dam and HEPP Installation Construction


Work Experience Certificate (Subcontractor - Work Completion)

 

1.

Employer Administration

:

General Directorate of state Water Works

2.

Employer

:

Kiska Limited Partnership Co.

3.

Name of the main work

:

Dicle (Tigris) Dam and HEEP Installations Construction

4.

Location of work

:

DSİ X. Regional Directorate - Diyarbakır

5.

Name and Surname or Title of the Subcontractor

:

Kasmet Construction Industry Co. Ltd..

6.

Part of the work performed by the subcontractor

:

Concrete lining to spillway and slope surfaces, tunnel galleries, irrigation - derivation and power tunnels, Power plan (HEPP) building, pressure pipe concrete, side walls of spillway spill threshold, Tail water  discharge channel structure, pump station, water intake structure, inlet and outlet structures, concrete downstream bridge, river crossing bridge, roads and boxes and vents, supporting walls, open area concrete linings, drinking water storage tank and capture , channel, security squadron building, and dormitory building construction, surrounding walls and field concrete of administrative site, Construction of watchman cabins and various art buildings. ( The construction works of two derivation tunnels of (Ø 10 m) 717. 20 m and 775.54 m, Irrigation tunnel of 740 m, Energy Tunnel of 455 m, Injection and drainage gallery of (Ø 4,50 m) 4563 m ventilation shaft of (Ø 3,20 m) 305 m)

7.

Construction Techniques Used

:

Tunnels : All concrete structures drilled by drilling and blasting method, having anchorage bolts, with or without retaining, with steel mesh or spray concrete application, constructed by mobile tunnel steel form system with final concrete coating,: System of steel sliding formwork with resulting fair faced concrete, slope surfaces with anchorage bolts and spray concrete, the river crossing bridge made of steel construction with prefabricated beams, building constructions: Reinforced concrete cage beam system with fine productions having steel and wooden roofs.

8.

Contract date of the main work

:

13/01/1986

9.

Preliminary contract value of the main work

:

26.300.00 USD

10.

Total contract value of the main work

:

92.700.000 USD

11.

Date of contract between the contractor and subcontractor

:

09/01/1995

12.

Amount of contract between the contractor and subcontractor

:

6.715.000 USD

13.

Completion date of the works performad by subcontractor

:

31/12/2000

14.

Amount of the Certificate

:

12.960.696 USD

Kasmet Construction Industry Trade Incorporated Company


1